Archive for Slider

Residential Water System Hookup Information

May 09, 2010 No Comments by Jay Yeater

General Requirements   Water line from meter pit to building must be either 3/4” copper or 200 PSI plastic. Compression fittings to be used for all underground connections. Trace wire to be installed if plastic is used. Water line should be at least 36” deep. Drawing of water line placement in relationship to building is [...]

Slider, Utility News Read more